Jurnal SCER, A. (2024) “Analisis Biaya Dan Waktu Proyek dengan Menggunakan Metode Earned Value ”, Surakarta Civil Engineering Review (SCER), 4(1), pp. 52–64. Available at: https://ejurnal.unsa.ac.id/index.php/scer/article/view/273 (Accessed: 20 September 2024).