Yulia Ratih, S., Ningsih, R. . and Primantari, F. L. (2023) “ANALISIS OPTIMASI BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus: Gedung Rumah Sakit Jiwa Jurug)”, Surakarta Civil Engineering Review (SCER), 3(2), pp. 1–6. Available at: https://ejurnal.unsa.ac.id/index.php/scer/article/view/179 (Accessed: 20 September 2024).