Yulia Ratih, S., Ningsih, R. ., & Primantari, F. L. (2023). ANALISIS OPTIMASI BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus: Gedung Rumah Sakit Jiwa Jurug). Surakarta Civil Engineering Review (SCER), 3(2), 1–6. Retrieved from https://ejurnal.unsa.ac.id/index.php/scer/article/view/179