[1]
Yulia Ratih, S., Ningsih, R. and Primantari, F.L. 2023. ANALISIS OPTIMASI BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus: Gedung Rumah Sakit Jiwa Jurug). Surakarta Civil Engineering Review (SCER). 3, 2 (Nov. 2023), 1–6.